Thickwood Perimeter Sewer – Phase I Storm Outfall

Project Information

 

Construction and installation of a 486 m Direct Pipe trenchless crossing beneath an existing urban park facility and geohazard. The crossing comprised of NPS 48, 19.1 mm WT Gr. 483 pipe which was constructed to an oil and gas (CSA-Z662) standard. Steel River’s scope of work included pipe and parent coating procurement, pipe welding, thruster frame welding (CWB), non-destructive examination, internal and external girth weld coating, pullback, and lifting support, and testing and disposal of drilling waste.

PROJECT NAME

THICKWOOD PERIMETER SEWER

PHASE I STORM OUTFALL

CLIENT NAME

CONFIDENTIAL CLIENT

SCOPE

DIRECT PIPE INSTALLATION

OF 48” PIPELINE

LOCATION

FORT MCMURRAY