Project Information
Construction and installation of two direct pipe trenchless crossings under CN railway with CNOOC Long Lake Facility. Each crossing consisted of 720 lineal meters in length and a 48-inch diameter pipe. Steel River’s scope of work was pipe welding, excavation & backfill of entry and exit pits, and pull back support including lifting and supporting the pipe segment.